Concrete Pumping Can Save Your Money

junhua   
   Á¶È¸ 2123   Ãßõ 0    

https://www.junhuamachinery.com/Mobile-concrete-batching-plant-with-d¡¦ (173)
https://www.junhuamachinery.com/Twin-Shaft-Concrete-Mixer-p.html (139)

 

You may be interested in learning how concrete pumping can save your money. The ability to unload your material from the truck directly to its needed location can save you time and man-hours. And fast pumping allows you to finish the job quicker thus saving you your hard-earned cash.


The traditional method of pouring floors and stems involved trying to back a mixing truck as close to the location as possible. When the trucks could not get close enough, the material had to be moved in wheelbarrows requiring a lot of extra time and effort. The mix also had to be wet in order for it to flow down the chute. Sometimes ramps had to be built in order to get the mix where it needed to go.


With the availability of pumps, the old method may no longer be the most practical way to pour this mix. Now a hose can be placed precisely where it is needed, and the mixture can be forced through it in much less time, requiring fewer men. Whether you are building a single-story residence or a high-rise building, you can get the material you need exactly at its needed location.


This method of pouring allows the trucks to remain safely away from the job site on the street and away from the holes and clutter that are a necessary part of the construction. This means that trenches do not have to be backfilled and scaffolding or other equipment do not have to be moved in order for the trucks to back up and unload. The results can be faster unload times and the ability to empty one mixer then go directly to the next one.


Another advantage of the pump is it can deliver a drier mix. Since the material is being pushed through the tube you can get the consistency needed which can provide a stronger structure and faster drying time. You can eliminate unproductive time spent waiting for the material to harden before it can be finished.


These pumps are available for any job no matter how small or how large it can be. They can be mounted on a small trailer or a large boom truck depending on the application. They allow you not only to place the concrete where it is needed but also control the speed of the flow. You can determine the pace of the job and receive material where and when you need it.


Now it does not matter what type of job you are trying to accomplish. It could be a backyard patio or a one-hundred-story office building. The fastest and the easiest way to obtain the mix you need is by pumping it there.


You may want to try this quicker safer method now that you know how concrete pumping can save you money. Get the mix you need and get it precisely where it is needed and get the job done in record time. You may never want to go back to the old method of pouring again.

More information,please visit JUNHUA machinery, click here.

ªÀº±Û Àϼö·Ï ½ÅÁßÇÏ°Ô.
¾î¸¶....

¾Ö...... Àç¹ÌºÙ¿´³×¿ä..

¾ß ¯²² ½ÃÄû¾ß !!!
Are you crazy ?..
Go away !!

°°ÀÌ ¿åÁ» ÇØ ÁÖ½ÃÁÒ..... ¹ú±³ ½ºÅ¸ÀÏ·Î !!  ÀÌÀå´Ô !!

~~ ¿ì¸° ¹äÀ» ¸Ô¾îµµ ¹ÝÂùÀÌ 40°¡Áö°¡ ³Ñ¾î, ÀÌ C8 ¯±ú¾ß !!


QnA
Á¦¸ñPage 3050/5680
2014-05   4945685   Á¤ÀºÁØ1
2015-12   1482380   ¹é¸Þ°¡
2012-10   4786   weirdymusic
2021-09   1967   Midabo
2012-11   5278   DOSS
2021-09   2551   °ø¹é±â
2023-04   1562   Â÷³ÝÄÄÇ»ÅÍ
2012-11   6316   Âü¼¼»ó¸Í±Û±â
2017-12   3282   Antony
2017-12   3779   ¾Óµå·¹ÁØ
2012-11   5314   ÀϹÝÀ¯Àú
2014-08   3409   ¿Õ¿ëÇÊ
2016-11   5420   ±è°Ç¿ì
2019-02   3195   Æ÷½´¸®
2021-09   2124   junhua
2019-02   3947   ¿©ÁÖ³ó¹Î76
2009-10   6675   ±è´ëÆò
2009-10   8278   ¹Ú¿µ·Ï
2012-12   5761   ±è°Ç¿ì
2020-05   2632   ±è¿µ±â
2009-11   9238   ½ÂÈĴϵµÄì
2014-08   3813   À¯¹Î¿ì2